Home / MCQ Bank / Mathematics
Mathematics Time And Work Difficulty: Medium

A group of 12 men can do a piece of work in 14 days and other group of 12 women can do the same work in 21 days. They begin together but 3 days before the completion of work, man's group leaves off. The total number of days to complete the work is:

Select the correct option to test your answer:

More Mathematics Questions

If $$\frac{{4x}}{3} + {\text{2P}} = 12$$ for what value of P, x = 6? In an examination 40% failed in Urdu, 45% failed in English. If 25% students failed in both the subjects. Then the percentage of failed students is________? A watch was sold at a loss of 10%. If it was sold for Rs.140 more, there would have been a gain of 4%. What is the cost price? Alcohol and water in two vessels A and B are in the ratio 5 : 3 and 5 : 4 respectively. In what ratio, the liquid of both the vessels be mixed to obtain a new mixture in vessel C in the ratio 7 : 5 ? Evaluate: $$\frac{1}{{15}} + \frac{1}{{35}} + \frac{1}{{63}} + \frac{1}{{99}} + \frac{1}{{143}}$$