The time with which direct cost does not reduce with the increase in time is known as

Select the correct option to test your answer:

More Civil Engineering Questions

Non acid-resistant asbestos is: The ratio of the moment of inertia of a rectangle about its centroidal axis to the moment of inertia about its base, is The Polaris describes a small circle round the pole whose radius is approximately Early attainment of strength in rapid hardening cement is mainly due to A steel bar 20 mm in diameter simply-supported at its ends over a total span of 40 cm carries a load at its centre. If the maximum stress induced in the bar is limited to N/mm 2 , the bending strain energy stored in the bar, is