Home / MCQ Bank / Civil Engineering
Civil Engineering Construction Planning And Management Difficulty: Medium

If the expected time for completion of a project is 10 days with a standard deviation of 2 days, the expected time of completion of the project with 99.9% probability is

Select the correct option to test your answer:

More Civil Engineering Questions

Duco paints are A particle is dropped from a height of 3 m on a horizontal floor, which has a coefficient of restitution with the ball of $$\frac{1}{2}$$. The height to which the ball will rebound after striking the floor is If θ and δ be the latitude of an observer and declination of a heavenly body respectively, the upper culmination of the body will be south of zenith if its zenith distance, is When two equally important roads cross roughly at right angles, the suitable shape of central island is The construction estimate of a project is used by: