Home / MCQ Bank / Civil Engineering
Civil Engineering Engineering Economics Difficulty: Medium

The key to profitable operation for project cost control, is:

Select the correct option to test your answer:

More Civil Engineering Questions

The standard B.O.D. of water is taken for Which of the following bricks are used for lining of furnaces? In prestressed concrete structures the primary problem is damaged caused to ____________ The forces which meet at one point and have their lines of action in different planes are called The best unit duration of storm for a unit hydrograph is