Home / MCQ Bank / Civil Engineering
Civil Engineering Engineering Economics Difficulty: Medium

Which method is adopted to develop an approximate or conceptual estimate for perimeter works for buildings from the following?

Select the correct option to test your answer:

More Civil Engineering Questions

One end of an elastic string of natural length 'l' and modulus 'X' is kept fixed while to the other end is attached a particle of mass m which is hanging freely under gravity. The particle is pulled down vertically through a distance 'x', held at rest and then released. The motion is Assertion (A): Activity 57 is critical. Reason (R): Earliest finish time and latest finish time for events 57 are same At upper culmination, the pole star moves The point on the celestial sphere vertically below the observer's position, is called If 'δ' is the declination of the star and 'φ' is the latitude of the observer then the hour angle of the star at elongation is given by