Home / MCQ Bank / Civil Engineering
Civil Engineering Estimating And Costing Difficulty: Medium

According to ISI method of measurement, the order of the sequence is

Select the correct option to test your answer:

More Civil Engineering Questions

Number of dog spikes normally used per rail seat on curved track is The relation between the air base (B), photographic base (b), flying height (H) and the focal length (f) of a vertical photograph, is Rise of water table above the ground surface causes In a B.G. railway track, the specified ruling gradent is 1 in 250. The horizontal curve of 3° on a gradient of 1 in 250 will have the permissible gradient of The correct relation between curve lead (CL), switch lead (SL) and lead of crosssing (L) is given by