Civil Engineering Waste Water Engineering Difficulty: Medium

The reduced levels of the string at the consecutive sight rails A and B are 203.575 m, 203.475 m respectively. If the difference of their R.D.s is 10 m, the gradient of the sewer line is

Select the correct option to test your answer:

More Civil Engineering Questions

The main principle of an organization, is The price at which the callable bond will be redeemed from the bondholder is called ______. An R.C.C. beam not provided with shear reinforcement may develop cracks in its bottom inclined roughly to the horizontal at The bearing capacity of a water logged soil, may be improved by Assertion A: Slow sand filters are more efficient in removal of bacteria than rapid sand filters. Reason R: The sand used in slow sand filters is finer than that in rapid sand filters Select your answer based on the coding system given below: