Home / MCQ Bank / Mathematics
Mathematics Time And Work Difficulty: Medium

A and B together can do a piece of work in 30 days. A having worked for 16 days, B finishes the remaining work alone in 44 days. In how many days shall B finish the whole work alone?

Select the correct option to test your answer:

More Mathematics Questions

The diagonal of a quadrilateral shaped field is 24 m and the perpendiculars dropped on it from the remaining opposite vertices are 8 m and 13 m. The area of the field is? Fresh fruit contains 68 % water and dry fruit contains 20 % water. How much dry fruit can be obtained from 100 kg of fresh fruits? A train 300 meres long is running at a speed of 25 metre per second. It will cross a bridge of 200 metres long in : The total cost of flooring a room at Rs. 8.50 per square metre is Rs. 510. If the length of the room is 8 m, its breadth is : If 25 th of August in a year is Thursday, the number of Mondays in that month is