Home / MCQ Bank / Mathematics
Mathematics Time And Work Difficulty: Medium

A can complete a certain work in 4 minutes, B in 5 minutes, C in 6 minutes, D in 10 minutes and E in 12 minutes. The average number of units of work completed by them per minute will be = ?

Select the correct option to test your answer:

More Mathematics Questions

A balloon leaves the earth at a point A and rises vertically at uniform speed. At the end of 2 minutes, John finds the angular elevation of the balloon as 60°. If the point at which John is standing is 150 m away from point A, what is the speed of the balloon? The edges of three iron cubes are 6cm; 8cm; 10cm respectively. A new cube was made by melting them. Find the edge of the new cube? A group of workers can complete a piece of work in 50 days, when they are working individually. On the first day one person works, on the second day another person joins him, on the third day one person joins them and this process continues till the work is completed. How many approximate days are needed to complete the work ? Sabarmati express takes 18 seconds to pass completely through a station 162 m long and 15 seconds through another station 120 m long. The length of the train is : The product of two numbers is 2008 and their HCF is 13. The number of such pairs is = ?