Select the correct option to test your answer:
More Mining Engineering Questions
In a cut-and-fill stope, the main purpose of back filling is to
A 15 m 3 dragline is deployed in an O.B. bench of an O.C. mine. It works for 40 days at the rate of 6 hrs per shift and 3 shifts a day. The cycle time, bucket fill factor, and operating efficiency of the dragline are respectively 50 s, 0.8, and 75%. The total volume of O.B. in m 3 handled by the dragline is
If the wire rope is coated with molten zinc called as . . . . . . . .
As per DGMS Circular which of the following factors is responsible most for causing the accidents due to Dumpers, trucks/tippers in opencast coal mines?
Hydrogenation invented in the year