Home / MCQ Bank / Civil Engineering
Civil Engineering Concrete Technology And Design Of Concrete Structures Difficulty: Medium

Assertion A: The load factor for live load is greater than that for dead load. Reason R: The live loads are more uncertain than dead loads. Select your answer based on the coding system given below:

Select the correct option to test your answer:

More Civil Engineering Questions

The point on the photograph where bisector between the vertical line through optical centre of the camera lens and the plate perpendicular meets, is known as An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It has no salvage value at the end of 8 years. The book value of the excavator at the end of 3 years using general double declining balance method is If the thickness of plate to be connected by a rivet is 16 mm, then suitable size of rivet as per Unwin's formula will be In order of increasing percentage of silica, the correct sequence is Irrigation water having the concentration of Na ++ , Ca ++ and Mg ++ as 20, 3 and 1 Milli equivalent per litre respectively will be classified as