For transferring the tunnel alignment through shafts, we adopt the following steps: 1.Hanging two or more plumb lines in the shaft 2.Determining the bearing of the plumb lines i.e. plumb plane 3.Suspending a 35 kg weight by each plumb line 4.Immersing the weights of both the plumb lines in the buckets containing water The correct sequence of steps is: