If m men can do a work in r days, then the number of days taken by (m + n) men to do it is :

Select the correct option to test your answer:

More Mathematics Questions

Due to the technical snag in the signal system two trains start approaching each other on the same track from two different stations, 240 km away each other. When the train starts a bird also starts moving to and fro between the two trains at 60 kmph touching each train each time. The bird initially sitting on the top of the engine of one of the trains and it moves so till these trains collide. If these trains collide one and half hour after start, then how many kilometers bird travels till the time of collision of trains? The smallest 6-digit number exactly divisible by 111 is : I is the incentre of ΔABC, ∠ABC = 60° and ∠ACB = 50°, Then ∠BIC is How many numbers are there from 700 to 950 (including both) which are neither divisible by 3 nor by 7? Two pipe can fill a cistern in 3 hours and 4 hours respectively and a waste pipe can empty it in 2 hours. If all the three pipes are kept open, then the cistern will be filled in-