Home / MCQ Bank / Mathematics
Mathematics Basic Maths Difficulty: Medium

P can finish a work in 18 days. Q can finish the same work in 15 days. Q worked for 10 days and left the job. how many days does P alone need to finish the remaining work?

Select the correct option to test your answer:

More Mathematics Questions

The length, breadth and height of a room in the shape of a cuboid are increased by 10%, 20% and 50% respectively. Find the percentage change in the volume of the cuboid. If two numbers are each divided by the same divisor, the remainder are respectively 3 and 4. If the sum of two numbers be divided by the same divisor, the remainder is 2. The divisor is - Find the : 38% of 341 = ? Solve : $$\frac{17292}{33}$$ ÷ 8 = ? A trader mixes 26 kg of rice at Rs. 20 per kg with 30 kg of rice of other variety at Rs. 36 per kg and sells the mixture at Rs. 30 per kg. His profit percent is: