If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is
The maximum depth of sedimentation tanks, is kept
DGPS is based on the concept that bias errors in the position of locations in a given local area, are same if their distances are within
The following tunnels were constructed in different countries for different purposes: 1.Emperor Claudius built the first Roman tunnel 2.The first highway tunnel was constructed in Hungary 3.The first underground railway tunnel was constructed in Great Britain 4.The first navigational tunnel was constructed in France. The correct chronological development of these tunnels is:
The fire demand of a city may be worked out by