Home / MCQ Bank / Mining Engineering
Mining Engineering Mine Surveying Difficulty: Medium

The area of triangle whose sides are 30m, 40m and 50m is . . . . . . . .

Select the correct option to test your answer:

More Mining Engineering Questions

Type of rope most suitable for balancing rope in koepe winding is . . . . . . . . In ring drilling by drifters, we normallyuse the drill bits having dia in mm. The sampling pipe should be extended that . . . . . . . .m inside the fire stoping. Rhyolite, Trachytes and Basalt is An O.C. mine requires 16 blocks of overburden of 3000 te each to mine 4 blocks of coal of 2000 te each. The mining cost of both overburden and coal is Rs. 50 per tonne. The cost of transportation of overburden to dump areas is Rs. 50 per tonne. Coal transportation cost to the selling point is Rs. 75 per tonne. The price of coal is Rs. 800 per tonne, If the royalty and tax to the state is Rs. 50 per tonne, the nominal profit in rupees is