Civil Engineering Building Construction Difficulty: Medium

The bond in which headers and stretchers are laid in alternate courses and every stretcher course is started with a three fourth brick bat, is known as

Select the correct option to test your answer:

More Civil Engineering Questions

The difference in level between the top of a bank and supply level in a canal, is called A bar L metre long and having its area of cross-section A, is subjected to a gradually applied tensile load W. The strain energy stored in the bar is Lapped splices in tensile reinforcement are generally not used for bars of size larger than If D is the depth of scour below original bed, then the width of launching apron is generally taken as The compound of Portland cement which reacts immediately with water and also sets first is