Supporting system used in coal mine gate roads in general is
Drilling in hard strata generally carried out by using drilling with
In an opencast mine loading and transporting has been carried out by shovel dumper combination. There is only one shovel is in operation. Dumpers arrive at the rate of 10 dumpers per hour and it takes shovel on an average 5 minutes to load a dumper. Assume arrival is Poisson and service time is exponentially distributed, find the expected number of dumpers waiting to be load in the system.
The Triaxial cell can test specimens upto . . . . . . . . long.
Ventilation stoppings made of . . . . . . . .