Select the correct option to test your answer:
Mining Engineering
Mine System Engineering
Difficulty: Medium
Three jobs A, B and C are to be assigned to three machines X, Y and Z. The processing costs are given below: Machines X Y Z Job A 19 28 31 B 11 17 31 C 12 15 13 The minimum total cost of assigning the jobs to the machines is.