Home / MCQ Bank / Mathematics
Mathematics Time And Work

P can complete $$\frac{1}{4}$$ of a work in 10 days, Q can complete 40% of the same work in 145 days. R, complete $$\frac{1}{3}$$ of the work in 13 days and S, $$\frac{1}{6}$$ of the work in 7 days. Who will be able complete the work first ?

Select the best option to verify your answer:
Show Correct Answer
Correct Answer: Option C • R

Related Mathematics Questions

In ΔABC, D and E are the mid points of sides BC and AC, respectively. If AD = 10.8 cm, BE = 14.4 cm and AD and BE intersect at G at a right angle, then the area (in cm 2 ) of ΔABC is: Incomes of A, B, and C are in the ratio 7 : 9 : 12 and their respective expenditures are in the ratio 8 : 9 : 15. If A saves $$\frac{{\text{1}}}{{\text{4}}}$$ of his income, then the ratio of their savings is - A shopkeeper claims to sell his articles at Rs. 20 per kg which cost him Rs. 23 per kg. But while selling, he uses a false weight and gives only 800 gm instead of 1 kg. What is his profit percentage? The length of the portion of the straight line 3x + 4y = 12 intercepted between the axes is: The base of a triangle is increased by 40%. By what percentage (correct to two decimal places) should its height be increased so that the area increases by 60%?